Version: 1.0
Status: Proposed: 12/11/96
Contact: James Davis
The guidelines outlined in this document define the minimum set of expectations for the personnel responsible for setup, maintenance and support of the ATM hardware installed as the edge devices on the campuses. This guideline will be reviewed as necessary to reflect changes in technology and customer requirements.
Organizational Elements:
College:
Each campus and the System Office will install an ATM switch and router that will serve as the edge device or the front door to the college local infrastructure.
VCCS Network Operations Center (NOC):
The VCCS NOC will provide 7 day x 24 hour management support for the VCCS ATM Network which includes the monitoring of the ATM circuits, edge hardware, and services provided by the mainframe and compressed video hub centers.
VCCS Telecomm Engineers:
The VCCS Telecomm Engineering Group provides fault resolution for the VCCS intranet and internet services. They are responsible for the overall design, implementation, maintenance and support of the logical and physical infrastructure that serves as the transport for VCCS intranet and internet services.
VCCS Hardware/Software Supply Centers:
The supply centers will distribute replacement parts and software for the edge hardware; and ensure that stocks are replenished using vendor supplied maintenance contracts.
Responsibilities:
College:
VCCS Telecomm Engineers:
VCCS Network Operations Center (NOC):
VCCS Hardware/Software Supply Centers:
NOTE: The VCCS requests that all software/hardware configurations changes be coordinated with the System Offices ITS staff until the VCCS Telecomm and VCCS NOC have been formally established. The staff will be working to complete the major ATM Network implementation activities and it is very important that all work involving the switch and router be coordinated with the ITS staff during this interim period. Please direct any inquiries to Roney Boyd SOBOYDR@vccs.edu.